英文字典中文字典


英文字典中文字典51ZiDian.com



中文字典辞典   英文字典 a   b   c   d   e   f   g   h   i   j   k   l   m   n   o   p   q   r   s   t   u   v   w   x   y   z       







请输入英文单字,中文词皆可:

ravs    
ravs: /ravz/, Chinese ravs, n. [primarily MIT/Boston usage] Jiao-zi (steamed or boiled) or Guo-tie
(pan-fried). A Chinese appetizer, known variously in the plural as
dumplings, pot stickers (the literal translation of guo-tie), and (around
Boston) ‘Peking Ravioli’. The term rav is short forravioli’, and
among hackers always means the Chinese kind rather than the Italian kind.
Both consist of a filling in a pasta shell, but the Chinese kind includes
no cheese, uses a thinner pasta, has a pork-vegetable filling (good ones
include Chinese chives), and is cooked differently, either by steaming or
frying. A rav or dumpling can be cooked any way, but a potsticker is
always the pan-fried kind (so called because it sticks to the frying pot
and has to be scraped off). “Let's get hot-and-sour soup and three
orders of ravs.” See also oriental
food.


请选择你想看的字典辞典:
单词字典翻译
ravs查看 ravs 在百度字典中的解释百度英翻中〔查看〕
ravs查看 ravs 在Google字典中的解释Google英翻中〔查看〕
ravs查看 ravs 在Yahoo字典中的解释Yahoo英翻中〔查看〕





安装中文字典英文字典查询工具!


中文字典英文字典工具:
选择颜色:
输入中英文单字

































































英文字典中文字典相关资料:


  • Lakeshore Erosion Control – Riprap Repair dnr. wi. gov General Permit . . .
    Lakeshore Erosion Control – Riprap Repair General Permit Application Checklist 8 Vegetation plan - Native vegetation must be seeded above the ordinary high water mark (OHWM)
  • DNR Response or Action Timelines and Review Fees for Common Solid Waste . . .
    h ch NR 140, Wis Adm Code, Groundwater standard exemptions (A single $2,000 fee is charged) 3 A plan modification also applies to submittals requesting to change the NR 140 design management zone (DMZ) or requests for approval of indicator preventative action limits (PALs) or alternative concentration limits (ACLs), under chs
  • DECISION DOCUMENT FOR THE APPROVAL OF JUG CREEK TMDL
    The State identified the narrative standard set forth at Section NR 102 04 (1) intro and (a) of the Wisconsin Administrative Code (WAC) as the applicable standard This standard states in part, “Substances that will cause objectionable deposits on the shore or in the bed of a body of water,
  • January 15, 2025 Heidi. SchmittMarquez@wisconsin
    1, 2024 Installation of HW-3 and HW-4 is in process, with anticipated completion prior to Spring 2025 Construction activities associated with the Outfall 8 pilot test are also slated for Spring 2025 We are available to discuss this information and any questions you may have, in more detail if desired Sincerely, Denice Nelson Senior Director
  • Fish and Wildlife Habitat Structures dnr. wi. gov General Permit . . .
    Payment must be submitted through the ePermitting System as part of the application process The appropriate fee will be viewable at the end of the ePermitting application submittal process 3 Application Checklist – a signed copy of the permit application checklist certifying that the applicant agrees to meet the
  • Watershed Detail - Little Platte River - Wisconsin
    In addition, Platteville is developing a sewer service area (SSA) plan Such plans are required for municipalities with populations over 10,000 These plans are a means of planning for cost-effective sewered growth Stormwater management issues are expected to be addressed through this planning process Date 2001
  • Technical Assistance, Environmental Liability Clarification or Post . . .
    D Approval of a Site-Specific Soil Cleanup Standard -NR 720 10 or 12, [67] -Include a fee of $1050 D Review of a Remedial Action Options Report-NR 722 13, [143] -Include a fee of $1050 D Review of a Remedial Action Design Report -NR 724 09, [148] -Include a fee of $1050
  • Waterflea Sampling Protocol - Wisconsin
    4 Repeat the process at the other two pre-selected sites Composite the samples from the three sites into one 250 -ml or larger (1-liter) bottle to obtain a single sample for the lake 5 Label the sample bottle with external labels Prepare labels prior to sampling so that you don’t have to write on wet paper 6
  • March 23, 2020 Re: Work Scope for PFAS Sampling of Groundwater
    the procedures we utilized followed our PFAS Standard Standard Operating Procedure (SOP) referenced below to minimize the potential for inadvertently introducing PFAS to the wells from ancillary sources such as household products and equipment Initial sampling for PFAS will be limited to new wells MW-19AR, MW-20R, and MW-28R shown on Figure 1
  • State of Wisconsin Technical Assistance, Environmental Liability . . .
    Approval of a Site-Specific Soil Cleanup Standard - NR 720 10 or 12, [67] - Include a fee of $1050 Review of a Remedial Action Options Report - NR 722 13, [143] - Include a fee of $1050 Review of a Remedial Action Design Report - NR 724 09, [148] - Include a fee of $1050





中文字典-英文字典  2005-2009