英文字典中文字典


英文字典中文字典51ZiDian.com



中文字典辞典   英文字典 a   b   c   d   e   f   g   h   i   j   k   l   m   n   o   p   q   r   s   t   u   v   w   x   y   z       







请输入英文单字,中文词皆可:

ductileness    
延性

延性

ductileness
n 1: the malleability of something that can be drawn into
threads or wires or hammered into thin sheets [synonym:
{ductility}, {ductileness}]


请选择你想看的字典辞典:
单词字典翻译
ductileness查看 ductileness 在百度字典中的解释百度英翻中〔查看〕
ductileness查看 ductileness 在Google字典中的解释Google英翻中〔查看〕
ductileness查看 ductileness 在Yahoo字典中的解释Yahoo英翻中〔查看〕





安装中文字典英文字典查询工具!


中文字典英文字典工具:
选择颜色:
输入中英文单字

































































英文字典中文字典相关资料:


  • Muskrat Falls Generating Station - Wikipedia
    The Muskrat Falls Generating Station is a hydroelectric generating station on the Churchill River in Newfoundland and Labrador, Canada It is located downstream of the Churchill Falls Generating Station The station at Muskrat Falls has a capacity of over 824 MW and provides 4 5 TWh of electricity per year [4]
  • Lower Churchill Project - Quick Facts – Muskrat Falls Development . . .
    The Muskrat Falls Generating Station will have a capacity of 824 megawatts and annual energy production of 4 9 terawatt hours A concrete dam will be constructed in two sections with the north dam being 32 metres high and 432 metres long and the south dam being 29 metres high and 325 metres long
  • Lower Churchill River Hydroelectric Generation Project - Newfoundland . . .
    The Muskrat Falls facility will have a capacity of 800 MW, including a dam at the north section 32 metres high by 180 metres long, and, south section 29 metres high by 370 metres long with a reservoir 60 kilometres long, flooding an additional 36 square kilometre area
  • Muskrat Falls generating unit must be fully dismantled, says report . . .
    At least one of the generating units at the Muskrat Falls hydroelectric dam must be fully dismantled to undergo repairs It's a “significant undertaking” for which the cost and timeline are
  • 5 Muskrat Falls Project - Pub
    In 1989, a supplemental development layout study of the Muskrat Falls site was prepared with a total installed capacity of 824 MW The higher installed capacity resulted from a project optimization study that considered Muskrat Falls as part of an integrated development of the Lower Churchill, leaving the Upper Churchill Project for energy exports
  • Canada, Muskrat Falls - Andritz
    Construction of the 824 MW Muskrat Falls mega-project on the lower reaches of Canada’s Churchill River began in 2013 and was completed in November 2021
  • Lower Churchill Project - Finance
    The Muskrat Falls development has a capacity of 824 MW and can produce 4 9 terawatt hours (TWh) annually Electricity from the Muskrat Falls generating facility, through the Strait of Belle Isle, will reach
  • Backgrounder - Muskrat Falls - Government of Newfoundland and Labrador
    The Lower Churchill Project consists of two proposed installations, Gull Island and Muskrat Falls The combined capacity of both facilities will be 3,074 MW, providing almost 17 terawatt hours of electricity per year
  • From Churchill Falls to Muskrat Falls: An Interview with the President . . .
    Is Muskrat Falls operating at full capacity now, including the undersea transmission lines? What were some of the reasons for the high cost of Muskrat Falls? Can you discuss Churchill Falls, the technical achievement of building the project, and the contract that set a low power price for 70 years?
  • Muskrat Falls Project Customer Rates
    • There is limited capacity available to serve peak load growth As a result, demand management initiatives will target limiting growth in peak demand to avoid additional resource investments • High marginal capacity costs during winter months • Once the Muskrat Falls Project is in service, Hydro projects a low





中文字典-英文字典  2005-2009