  • I-95 AND SR 896 INTERCHANGE PROJECT VALUE ENGINEERING STUDY
    The Design Team identified the following positive attributes of the double flyover interchange: • Separates through traffic on Southbound I-95 from exiting SR 896 traffic • Eliminates heavy weave movements at Ramp C and D on SR 896 Bridge • Improves diverge and merge congestion on Ramp J • Meets parameters identified in existing
  • I-73 SOUTHERN SECTION RIGHT OF WAY PLANS VALUE ENGINEERING STUDY
    Recommendation 1 I‐95 I‐73 Interchange Widen the two main interchange ramps from one, 16’ lane to two, 12’ lanes Traffic projections show that the two main interchange fly‐over’s may fail in 25 to 30 years according to the high DHV’s (based on a non‐tolled facility)
  • OHIO RIVER BRIDGES SECTION 1 - KENNEDY INTERCHANGE VALUE ENGINEERING . . .
    port February 15, 2008 URS Corporation General URS conducted a Value Engineering Study of the Louisville Southern Indiana Ohio River Bridges (LSIORB), Section 1 – Kennedy Interchange The topic was the 80% Joint Inspection Submission prepare
  • Value Engineering For Transportation Improvements
    Value improvement is the primary basis for comparison of competing ideas To ensure that costs are comparable within the ideas proposed by the VE team, the PD E Preferred Alternative costs and LPA Group preliminary cost estimates were used as the pricing basis
  • THE PRACTICAL DESIGN VALUE ENGINEERING PARTNERSHIP – It Works
    What is its worth? What else would work? What does that cost? Can it be eliminated? ISL B15 ISL R10 -Route EB Parkway Ramp under Future SB I-44 Ramp QUESTIONS?
  • I-280 Winchester Boulevard Interchange Improvements Project
    To facilitate construction, the Value Team developed alternatives to simplify column bents, realign ramps, and remove the existing pedestrian overcrossing (POC) obstacle during construction
  • CEM-512 Value Engineering Highway Project: South Interchange.
    CEM-512 Value Engineering Connect Two Major Interstate Routes: Northbound Westbound Construct and tunnel Northbound Interstate under the Main Railroad Tracks and East-West Interstate Estimated Cost $ 1 Billion Project Summary Part I: Introduction
  • Value Engineering Study FAI-74 and FAI-57 Champaign, IL
    The purpose of this project is to eliminate deficient geometric features, improve travel efficiency, and increase the traffic capacity of the roadways by implementing policy design speed and cross-sectional elements on both mainline interstates and ramps