英文字典中文字典


英文字典中文字典51ZiDian.com



中文字典辞典   英文字典 a   b   c   d   e   f   g   h   i   j   k   l   m   n   o   p   q   r   s   t   u   v   w   x   y   z       







请输入英文单字,中文词皆可:


请选择你想看的字典辞典:
单词字典翻译
basilare查看 basilare 在百度字典中的解释百度英翻中〔查看〕
basilare查看 basilare 在Google字典中的解释Google英翻中〔查看〕
basilare查看 basilare 在Yahoo字典中的解释Yahoo英翻中〔查看〕





安装中文字典英文字典查询工具!


中文字典英文字典工具:
选择颜色:
输入中英文单字

































































英文字典中文字典相关资料:


  • Freeboard - FEMA. gov
    Freeboard is not required by NFIP standards, but communities are encouraged to adopt at least a one-foot freeboard to account for the one-foot rise built into the concept of designating a floodway and the encroachment requirements where floodways have not been designated
  • Communities Should Consider Adopting a 2-Foot Freeboard Now!
    Now it’s time for local communities to follow suit by adopting a minimum of 2-foot freeboard regulations, if they don’t already have this standard Adopting a 2-foot freeboard in local floodplain management regulations typically is a relatively straightforward amendment
  • New HUD 2-Foot Freeboard Requirement - Mile High Flood District
    A key aspect of the program is a new rule from the Department of Housing and Urban Development (HUD) that requires all new structures in floodplains to be elevated at least two feet above the base flood elevation in order to be eligible for an FHA loan
  • A Benefits Analysis of Increased Freeboard for Public and . . .
    Results of this analysis provide some insight into the potential benefits associated with constructing and retrofitting nonresidential and public buildings to the proposed Federal Flood Risk Management Standard (FFRMS) being evaluated by FEMA, which would increase existing requirements for freeboard related to FEMA-funded mitigation projects
  • NEW Federal Standards and Why You Should Consider Adopting 2 Feet of . . .
    Currently, the Freeboard Value Approach (FVA) and the 500-year Floodplain 0 2 Percent Annual Chance Approach are acceptable for use in Washington State, depending on data availability Under the FVA, non-critical actions or development are required to build the lowest floor 2 feet above the BFE
  • What Are the FEMA Finished Floor Elevation Requirements?
    What Are the FEMA Finished Floor Elevation Requirements? Navigate FEMA's rules defining the minimum finished floor elevation (BFE + Freeboard) required for flood zone compliance and certification
  • Building Higher in Flood Zones: Freeboard - Reduce Your Risk, Reduce . . .
    The NFIP requires the lowest floor of structures built in Special Flood Hazard Areas (SFHAs) to be at or above the BFE, so a structure built with freeboard would have its lowest floor 1 foot or more above the BFE Adding freeboard will reduce NFIP insurance premiums
  • FAQs on CRS Class 8 Freeboard Prerequisite V3 - CRSresources
    The Class 8 freeboard prerequisite will be met provided that attached garages and enclosures below elevated buildings meet the minimum requirements of the NFIP (elevated to the base flood elevation or having proper openings)
  • FEMA Policy 078-3 - Regulations. gov
    This policy sets forth how FEMA will apply the Federal Flood Risk Management Standard (FFRMS) to establish the floodplain for FEMA Federally Funded Projects
  • Using Freeboard to Elevate Structures Above Predicted Floodwaters
    Freeboard is elevating a building's lowest floor above predicted flood elevations by a small additional height (generally 1-3 feet above National Flood Insurance Program [NFIP] minimum height requirements)





中文字典-英文字典  2005-2009